of self–propelled jib cranes.
Generally, to perform formwork and reinforcement works, supply concrete mix is used one crane.
Choosing a concrete pump as a paving machine, should take into account the relative placement of the concrete pump and concreted foundations – the desired range. Specifications for the concrete truck are given in (annex №1 tab. 19).
For transportation of concrete mix should select the brand of mixer truck (annex №1 tab. 20). The amount of concrete mix, hauled in mixer trucks must comply with concreting intensity.
With a relatively low intensity of concreting by the crane to be adopted a mixer truck 4÷5, m during the concreting by concrete pump – 5÷7, m.
|