Сборник задач по подготовке учащихся к международным исследованиям timss и pisa



Pdf көрінісі
бет107/109
Дата21.10.2022
өлшемі3,45 Mb.
#44704
түріСборник задач
1   ...   101   102   103   104   105   106   107   108   109
Байланысты:
ПИЗА ДАЙЫНДЫ0 ТАПСЫРМАЛАРЫ қазақша

Task 15. Accommodation repair
Required to repair an office. Aydos does this job for three days. Yerbol make the 
same job for four days and Meyram for 5 days. Give your answer for the following 
questions. 
Question 1. How much time they perform this work together? (Choose the 
correct answer). 
Answer ___________. 
Question 2: How long does all the work, if the first third part of it would fulfill 
Aidos, then the half of remaining part - Yerbol, and the rest - Meyram? 
Answer ___________. 
Question 3: Who does the work faster: Aidos, working alone, or Erbol Meyram 
and working together? 
Answer ___________. 
Task 16. Mountains. 
Table 6 gives the information on the highest mountains of each mountains. 
Using these data get the height of the mountains, and fill in the table 
Table 16. 
 
mountains 
mountains 
Data 
high
Everest 
Asia 
8852 m 
Aconcagua 
South America 
The height of Mount Aconcagua 
is 79% of the height of Mount 
Everest 
McKinley 
North America 
Mount Aconcagua at 798 meters 
higher than the Mc Kingsley 
mountain 
Kilimanjaro 
Africa 
The height of Mount Kilimanjaro 
at 199 cm less than the height of 
Mount Mc Kingsley 
Elbrus 
Europe 
6642 m 
Sentinel Range 
in the Massif Vinson 
Antarctica 
Heights of the Sentinel Range in 
the 13.98 times larger than the 
difference between the heights of 
the mountains Aconcagua and 
Elbrus 
Kosciusko 
Australia 
The height of Mount Kosciuszko 
at 2666 m less than the height the 
Sentinel Range 
Task 17. The design of the walls. 
It is necessary to glue the tiles on the wall, tiles consists of tablets. Tablets size 
is shown in Figure 2, and the dimensions of the walls 4m and 2.5m. 


173 
Question 1. What is the area of the wall? 
Answer ___________. 
Question 2. What is the area occupied by one tablet? 
Answer ___________. 
Question 3. Approximately how many tablets need for this wall? 
Answer ___________. 
Question 4. How many unbroken tablets needed make tile pattern symmetrical? 
Answer ___________. 
Task 17. Design. 
The length of the lozenge-shaped figure is 45cm. This figure necessary glue up 
with a rhombus drawing. (Figure 3). 
Question 1. What is the area of this figure? 
Answer ___________. 
Question 2. How many centimeters should be the length of the tablets to 
completely fill in this figure? 
Answer ___________. 
Task 19. Movement. 
Cyclist riding 4 hours at speed of 18 km / h. 
Question 1: How he must increase the speed to ride past the same way on the 0.5 
hour faster? 
Answer: 
_____________________________________________________________ 
Question 2: How the time would change if he will pass this distance at a speed 
of 20 km / h? 
Answer __________/ 


174 
Task 20. Age. 
Father and son together - '30, son and grandfather together - 60 years, and his 
father and grandfather together - 84 years. 
Question. How old is the father, son and grandfather separately? 
Answer: _________________________________________________________. 


Достарыңызбен бөлісу:
1   ...   101   102   103   104   105   106   107   108   109




©emirsaba.org 2024
әкімшілігінің қараңыз

    Басты бет