Инженерно-строительный журнал, № 1, 2017 Шарманов В.В., Симанкина Т.Л., Мамаев А.Е. BIM технологии в оценке уровня охраны труда // Инженерно-
строительный журнал. 2017. № 1(69). С. 77–88.
22. Czmoch I.
, Pękala A. Traditional design versus BIM based
design.
Procedia Engineering. 2014. Vol. 91. Pp. 210
–215.
23. Volkov A.A., Sukneva L.V. BIM-Technology in tasks of the
designing complex systems of alternative energy supply.
Procedia Engineering. 2014. Vol. 91. Pp. 377
–380.
24. Lindblad
H.,
Vass
S.
BIM
implementation
and
organisational change: a case study of a large Swedish
public client.
Procedia Economics and Finance. 2015.
Vol. 21. Pp. 178
–184.
25. Tarandi V. A BIM collaboration lab for improved through life
support.
Procedia Economics and Finance. 2015. Vol. 21.
Pp. 383
–390.
26. Tulenheimo
R.
challenges
of
implementing
new
technologies in the world of BIM
– case study from
construction engineering industry in Finland.
Procedia Economics and Finance. 2015. Vol. 21. Pp. 469
–477.
27. Sørensen N.L, Frandsen A.K., Øien T.B. Architectural
competitions and BIM.
Procedia Economics and Finance. 2015. Vol. 21. Pp. 239
–246.
28. Jankowski B., Prokocki J.
, Krzemiński M. Functional
assessment of BIM methodology based on implementation
in design and construction company.
Procedia Engineering. 2015. Vol. 111. Pp. 351
–355.
29. Porter S., Tan T., Tan T., West G. Breaking into BIM:
Performing static and dynamic security analysis with the
aid of BIM.
Automation in Construction. 2014. Vol. 40.
Pp. 84
–95.
30. Takim R., Harris M., Nawawi A. Building Information
Modeling (BIM): a new paradigm for quality of life within
architectural, engineering and construction (AEC), industry.
Procedia – Social and Behavioral Sciences. 2013. Vol. 101.
Pp. 23
–32.
31. Motawa I., Carter K. Sustainable BIM-based evaluation of
buildings.
Procedia – Social and Behavioral Sciences. 2013. Vol. 74. Pp. 419
–428.
32. Fridrich J.
, Kubečka K. BIM – the process of modern civil
engineering in higher education.
Procedia – Social and Behavioral Sciences . 2014. Vol. 141. Pp. 763
–767.
33. Bargstädt H.-J. Challenges of BIM for construction site
operations.
Procedia Engineering. Vol. 117. Pp. 52
–59.
34. Maia L., Mêda P., Freitas J.G. BIM methodology, a new
approach - case study of structural elements creation.
Procedia Engineering. 2015. Vol. 114. Pp. 816
–823.
35. Yenumula K., Kolmer C., Pan J., Su X. BIM-controlled
signage system
for
building
evacuation.
Procedia Engineering . 2015. Vol. 118. Pp. 284
–289.
36. Luo Y., Wu W. Sustainable design with BIM facilitation in
project-based learning.
Procedia Engineering. 2015.
Vol. 118. Pp. 819
–826.
37. Juszczyk M., Výskala M., Zima K. Prospects for the use of
BIM in Poland and the Czech Republic
– preliminary
research results.
Procedia Engineering. 2015. Vol. 123. Pp.
250
–259.
38. Plebankiewicz E., Zima K., Skibniewski M. Analysis of the
first Polish BIM-based cost estimation application.
Procedia Engineering. 2015. Vol. 123. Pp. 405
–414.
39. Tomek R., Kalinichuk S. Agile PM and BIM: a hybrid
scheduling approach for a technological construction
project.
Procedia Engineering. 2015. Vol. 123. Pp. 557
–
564.
40. Minagawa M., Kusayanagi S. Study on BIM utilization for
design improvement of infrastructure project.
Procedia Engineering. 2015. Vol. 125. Pp. 431
–437.
41. Bonenberg W., Wei X. Green BIM in sustainable
infrastructure.
Procedia Manufacturing. 2015. Vol. 3.
Pp. 1654
–1659.
42. Sharmanov V.V., Mamayev A.Ye., Boleyko A.S., Zolotova
Yu.S. BIM i Anderrayting
– tochki soprikosnoveniya. [BIM
and Underwriting : a common grounds].
Aktual'nye Pp. 383
–390.
26. Tulenheimo
R.
challenges
of
implementing
new
technologies in the world of BIM
– case study from
construction engineering industry in Finland // Procedia
Economics and Finance. 2015. Vol. 21. Pp. 469
–477.
27. Sørensen N.L, Frandsen A.K., Øien T.B. Architectural
competitions and BIM // Procedia Economics and Finance.
2015. Vol. 21. Pp. 239
–246.
28. Jankowski B., Prokocki J.
, Krzemiński M. Functional
assessment of BIM methodology based on implementation
in design and construction company // Procedia
Engineering. 2015. Vol. 111. Pp. 351
–355.
29. Porter S., Tan T., Tan T., West G. Breaking into BIM:
Performing static and dynamic security analysis with the
aid of BIM // Automation in Construction. 2014. Vol. 40.
Pp. 84
–95.
30. Takim R., Harris M., Nawawi A. Building Information
Modeling (BIM): a new paradigm for quality of life within
architectural, engineering and construction (AEC), industry
// Procedia
– Social and Behavioral Sciences. 2013.
Vol. 101. Pp. 23
–32.
31. Motawa I., Carter K. Sustainable BIM-based evaluation of
buildings // Procedia
– Social and Behavioral Sciences.
2013. Vol. 74. Pp. 419
–428.
32. Fridrich J.
, Kubečka K. BIM – the process of modern civil
engineering in higher education // Procedia
– Social and
Behavioral Sciences. 2014. Vol. 141. Pp. 763
–767.
33. Bargstädt H.-J. Challenges of BIM for construction site
operations // Procedia Engineering. Vol. 117. Pp. 52
–59.
34. Maia L., Mêda P., Freitas J.G. BIM methodology, a new
approach - case study of structural elements creation //
Procedia Engineering. 2015. Vol. 114. Pp. 816
–823.
35. Yenumula K., Kolmer C., Pan J., Su X. BIM-controlled
signage system for building evacuation // Procedia
Engineering. 2015. Vol. 118. Pp. 284
–289.
36. Luo Y., Wu W. Sustainable design with BIM facilitation in
project-based learning // Procedia Engineering. 2015.
Vol. 118. Pp. 819
–826.
37. Juszczyk M., Výskala M., Zima K. Prospects for the use of
BIM in Poland and the Czech Republic
– preliminary
research results // Procedia Engineering. 2015. Vol. 123.
Pp. 250
–259.
38. Plebankiewicz E., Zima K., Skibniewski M. Analysis of the
first Polish BIM-based cost estimation application //
Procedia Engineering. 2015. Vol. 123. Pp. 405
–414.
39. Tomek R., Kalinichuk S. Agile PM and BIM: a hybrid
scheduling approach for a technological construction
project // Procedia Engineering. 2015. Vol. 123. Pp. 557
–
564.
40. Minagawa M., Kusayanagi S. Study on BIM utilization for
design improvement of infrastructure project // Procedia
Engineering. 2015. Vol. 125. Pp. 431
–437.
41. Bonenberg W., Wei X. Green BIM in sustainable
infrastructure // Procedia Manufacturing. 2015. Vol. 3.
Pp. 1654
–1659.
42.
Шарманов В.В., Мамаев А.Е., Болейко А.С., Золотова
Ю.С. BIM и Андеррайтинг – точки соприкосновения //
Актуальные проблемы гуманитарных и естественных
наук. 2016. № 1–3. С. 167–173.
43.
МДС 12-28.2006 «Методическое руководство по
проведению
экспертной
оценки
безопасности
нестационарных рабочих мест на строительных
объектах» М.: 2007.
87