Инженерно-строительный журнал, №1, 2017


Magazine of Civil Engineering, No. 1, 2017



Pdf көрінісі
бет7/14
Дата03.12.2023
өлшемі1,7 Mb.
#133228
1   2   3   4   5   6   7   8   9   10   ...   14
 
81


Magazine of Civil Engineering, No. 1, 2017 
Sharmanov V.V., Simankina T.L., Mamaev A.E.
 
BIM in the assessment of labor protection. 
Magazine of Civil 
Engineering
. 2017. No. 1. Pp. 77–88. doi: 10.18720/MCE.69.7 
The system of monitoring (control) of level of labor protection and safe engineering was applied on 
the object, representing the site allocated under a construction of the apartment house with the built-in 
attached rooms and the attached car park located at the address: St. Petersburg, Obukhovskoy Oborony 
Avenue, house 110, Lit. B, in borders of the territorial zone TD1-2. 
When implementing this monitoring the software products of the Autodesk company are used. The 
implementation of a technique on a specific example is shown in the Figure 3. 
 
Figure 3. The integrated scheme of implementation of a technique 
Results and Discussion 
First step
. The PLUGIN built in program complexes of the Autodesk Company is developed for 
implementation of control. At the same time the accounting cards for entering of bypass data are created. 
This program allows to calculate the security index of the object. The model of a general view of a bypass 
on occupational health and safety is provided in the Figure 4. 
 
Figure 4.The bypass model of occupational health and safety 
Second step
. Bypass Information is entered in accounting cards. At the same time the program 
complex determines itself the inspector's arrangement in space by GPS navigation. In the accounting 
card necessary parameters of control are programmed. These parameters will be controlled throughout 
all construction. Each sphere has its identification number or ID-code. The following parameters of control 
were considered: 
1. the engineering processes of construction and installation works; 
2. the unprotected sites influencing injury risk on the object; 
3. the processing equipment used in work; 
4. electrical engineering
5. garbage.
1 step.
•Creation of accounting cards
2 step.
•Entering of data in accounting cards
3 step
•Creation of the report on bypass data 
4 step
•Determination of security index
82




Достарыңызбен бөлісу:
1   2   3   4   5   6   7   8   9   10   ...   14




©emirsaba.org 2024
әкімшілігінің қараңыз

    Басты бет