Magazine of Civil Engineering, No. 1, 2017 Sharmanov V.V., Simankina T.L., Mamaev A.E.
BIM in the assessment of labor protection.
Magazine of Civil Engineering . 2017. No. 1. Pp. 77–88. doi: 10.18720/MCE.69.7
Table 2. A report form after unloading of the entered data on a bypass Date
Report Project:
Project name
Security index:
90%
ID of the accounting card Evaluation criteria criterion 1 criterion 2 criterion 3 criterion 4 criterion 5 3659807
0
0
0
0
0
3659957
0
0
0
0
0
3660423
0
0
1
0
0
3660539
0
1
0
2
1
3661000
0
0
0
0
0
3591626
0
0
1
0
0
3591958
0
0
1
0
0
3654682
0
0
0
5
0
Numbers of each accounting card and indicators are reflected in the unloaded Table 6. The
quantity of marks is determined proceeding from that how many compliance or discrepancies according
to the regulating documentation were revealed.
Fourth step . As a result of unloading of the data PLUGIN calculates the security index expressed
as a percentage. The report on the level of the security index is created automatically by the program and
directly goes to the server to a management of the company. It should be noted that by results of a
bypass and depending on what positions there is weakening, the program gives particular
recommendations for rising of general level of the security index. Calculation of the security index is
made only according to accounting cards according to which the measurements were made, i.e. data
were entered.
The security index represents the generalized indicator characterizing a general condition on the
building site, being the effective tool capable to determine the level of safe engineering and labor
protection on a construction object. It is at the same time possible to track each of controlled parameters
and all situation in dynamics. Table 3 shows dynamics (Dynamics of the security index) of change of a
situation on the building site for five months.