| Байланысты: Tenaz Arman TasmagambetovPosition - E&I Foreman
Performing inspection for all E&I equipment installations, Hookup, loop checking and functional testing
are following the technical requirement according to the project specification
Inspection of cable installation including cable trays, cable glands, termination, insulation resistance,
continuity testing
Red Line Mark Up on drawings for E&I and Telecom Disciplines
Controlling all scopes job, planning, giving daily report to Engineering
Ensure that the installation site work according to the standards regulations and Project Specifications
Take actions whenever there are persons violating rules and procedures
Organization Method statement, risk assessment and Electrical isolation PTW (Permit)