Тоо «Tenaz Management» 060002, Республика Казахстан


November 2018 — December 2019 - TENGIZCHEVROIL LLP via Fircroft Engineering Services Limited Kazakhstan/ FGP-WPMP Control & Power IOCC Quality Engineer



бет4/8
Дата22.06.2023
өлшемі0,52 Mb.
#102999
1   2   3   4   5   6   7   8
Байланысты:
Tenaz Arman Tasmagambetov

November 2018 — December 2019 - TENGIZCHEVROIL LLP via Fircroft Engineering Services Limited Kazakhstan/ FGP-WPMP Control & Power IOCC Quality Engineer
Position - E&I QA/QC Substations Inspector

  • Controlling contractor procedures, inspection and test plans and other technical and quality documents, to ensure effective controls

  • Incoming Inspection of the material dept to ensure that materials have all needed documentation before

start of work

  • Performing inspection for all E&I equipment’s installations, hookup, loop checking and functional testing

are in compliance with the technical requirement according to the project specification

  • Inspection of cable installation including cable trays, cable glands, termination, insulation resistance,

continuity testing

  • Witnessing all tests including verification and calibration of instruments and safety devices

  • Inspection of Fiber optic cable installation

  • Inspection on 110kV Substation and 35/10 KV Substations

  • Inspection and tests of High voltage system from 110KV to 35KV and from 35KV to 10KV after installing

high voltage cables, Diesel generator, Power Transformer, Switchboard, Instrument Panel & HVAC Panel,
Lighting and Earthing system

  • Performing inspection for all E&I equipment’s installations, are in compliance with the technical

requirement according to the Project specification.

  • Follow the open and closed of the Observation Report Register SR and NCR

  • Quality control of all E&I pre-commissioning works



August 2018 — November 2018 - KAZPACO LLP via Fircroft Engineering Services LLP/ FGP Cargo Route Transportation (CaTRo) Project
Position - E&I QA/QC Inspector

  • Controlling contractor procedures, inspection and test plans and other technical and quality documents,

to ensure effective controls

  • Coordination with client for technical query and other activities related to ongoing construction

  • Incoming Inspection of the material dept to ensure that materials have all needed documentation before

start of work

  • Performing inspection for all E&I equipment’s installations, hookup, loop checking and functional testing

are in compliance with the technical requirement according to the project specification

  • Inspection of cable installation including cable trays, cable glands, termination, insulation resistance,

continuity testing

  • Witnessing all tests including verification and calibration of instruments and safety devices

  • Inspection of Fiber optic cable installation

  • Inspection of High voltage system up to 10KV, Diesel generator, power transformer, Switchboard & HVAC

  • Panel, Lighting and Earthing system

  • Performing inspection for all E&I equipment’s installations, are in compliance with the technical

  • requirement according to the project specification

  • Closing check list

  • Generating, reviewing and approving Electrical & Instrument QVD Matrix

  • Quality control of all E&I pre-commissioning works

  • Red Line Mark Up on drawings for E&I and Telecom Disciplines





Достарыңызбен бөлісу:
1   2   3   4   5   6   7   8




©emirsaba.org 2024
әкімшілігінің қараңыз

    Басты бет