"SCIENCE AND EDUCATION IN THE MODERN WORLD: CHALLENGES OF THE XXI CENTURY" NUR-SULTAN, KAZAKHSTAN, JULY 2019 11
out by one machine), which will significantly affect the production time. Also, the number of
machines used in SCM will be reduced, which will lead to a decrease in technical and economic
indicators.
Conclusion The introduction of a new machine for laying slabs will increase the pace of
construction of commercial roads, significantly reduce costs and reduce the complexity of
work. This is possible by reducing the number of machines used in the SCM, and the
installation of a vacuum gripping device, which allows to reduce the installation time of field
roads coatings.
References 1. Design of development and arrangement of fields as an integral part of oil and gas
service / S. M. Sokolov, V. A. Gorbatikov // Oil industry. – 2008. – № 9. – P. 14-15.
2. Funikova E. N., Ovodova E. V. Principal geological and geodynamic risks in the
design and operation of pipelines and monitoring / Oil & gas Terminal, the collected articles in
memory of Professor N. And. Melusina. – Tyumen: TIU, 2016. – № 10. – P. 118-122.
3. VSN 2-105-78. Instructions for the construction of temporary roads for pipeline
construction in difficult conditions (on watered and wetlands). – Moscow: Minneftegazstroy,
1978.
4. VSN 26-90. Instructions for the design and construction of roads of oil and gas fields
in Western Siberia. – Moscow: Ministry Of Transport, 1990.
5. Efremov D. A. automation of technological process of the device of a combined road
surface with use of onboard manipulation system : the dissertation ... candidate of technical
Sciences : 05.13.06 / Efremov Dmitry; [Place of defense: Moscow. state car.-expensive. in-t
(tech. UN-t)]. – M., 2009. – 167 p.