«полиметалл» АҚ Қызыл жобасының ЭӘӘБ


-тарау Экологиялық және әлеуметтік әсерді бағалау (ЭӘӘБ)



Pdf көрінісі
бет78/95
Дата06.03.2017
өлшемі57,11 Mb.
#7962
1   ...   74   75   76   77   78   79   80   81   ...   95

5-тарау Экологиялық және әлеуметтік әсерді бағалау (ЭӘӘБ) 

5.2 Бағалаудың жалпы әдістемесі 

 

1.



 

IAIA (2000) Development of SIA. Web Page. www.ext.nodak.edu/IAIA 

2.

 

Vanclay, F. (2000) Social Impact Assessment. In Handbook of Environmental Impact Assessment, 



Vol. 1 (ed. J. Petts), pp. 301-326. Oxford: Blackwell Science. 

3.

 



Barrow, C (1997) Environmental and Social Impact Assessment. London: Arnold. 

 

5.4 Парниктік газдарды шығару және климатты өзгерту   

 

1.

 



International  Finance  Corporation  (IFC).  2012.  IFC  Performance  Standards  on  Environmental 

and Social Sustainability. January 2012. 

2.

 

“Environmental  Assessment  (Summary)”  Asian  Development  Bank  -  Country  Partnership 



Strategy:  Kazakhstan  2012–2016,  based  on  Asian  Development  Bank.  2011.  Country 

Environment  Note-Kazakhstan;  Analytical  Report  on  Climate  Change  Impacts  and  Response 

Measures  (Kazakhstan);  and  Climate  Risk  Management  and  Adaptation  Roadmap.  Manila 

(unpublished consultant’s reports, November) 

3.

 

World Business Council for Sustainable Development (WBCSD), World Resource Institute (WRI). 



2004. GHG Protocol: Corporate Accounting and Reporting Standard. 2004 

4.

 



“Carbon  Emission  Factors  Report  for  Kazakhstan”  European  Bank  for  Reconstruction  and 

Development  (EBRD)  commissioned  report  produced  by  Laymeyer  International,  2012  (LI 

260574) 

5.

 



Bakyrchik  Mining  Venture  LLC,  "The  Bakyrchik  Gold  Deposit  Mine  and  Process  Plant 

Construction Feasibility Report - Volume 5: Infrastructure and power supply system" Polymetal 

Engineering JSC, St Petersburg, 2015 (Table 1.1, page 27) 

6.

 



“Carbon  Emission  Factors  Report  for  Kazakhstan”  European  Bank  for  Reconstruction  and 

Development  (EBRD)  commissioned  report  produced  by  Laymeyer  International,  2012  (LI 

260574) 

7.

 



Second National Communication of the Republic of Kazakhstan to the Conference of the Parties 

of the United Nations Framework Convention on Climate Change (UNFCCC), 2009 

 

5.5  Геохимиялық әсерді бағалау 

 

1.



 

International  Finance  Corporation  (IFC).  2012.  IFC  Performance  Standards  on  Environmental 

and Social Sustainability. January 2012 

 

5.6 Ауаның сапасы 

 

1.

 



Significance in Air Quality, Institute of Air Quality Management (2009)

 


Қызыл жобасының ЭӘӘБ,  

Дереккөздер тізімі 

 

 

ZT52-0156/MM1021 



December 2015 

Final V1.0 

 

Page 4 


 

2.

 



Bakyrchik  Mining  Venture  LLC,  The  Bakyrchik  Gold  Deposit,  MINE  AND  PROCESS  PLANT 

CONSTRUCTION, 34.01.06.001.00 PZ3, St Petersburg, 2015 

3.

 

Design Manual for Roads and Bridges (Volume 11, Section 3, Part 1, HA 207/07



 

 

5.7  Шу әсерін бағалау 

 

1.

 



Acoustics  --  Attenuation of sound during propagation outdoors  -- Part 2: General method of 

calculation, ISO9613-2:1996 

 

5.10.Биоәртүрлілік 

 

1.



 

IFC, (2012), IFC Performance Standards on Environmental and Social Sustainability, 

www.ifc.org

 

 



5.11 Археология және мәдени мұра 

 

1.



 

International  Finance  Corporation  (IFC).  2012.  IFC  Performance  Standards  on  Environmental 

and Social Sustainability. January 2012 

2.

 



The methodology for assessing impact significance in Section 6.2 does not include a receptor 

sensitivity level of negligible.  For the purposes of this analysis, the significance of impacts to 

cultural heritage resources of negligible sensitivity will be assessed as one degree lower than a 

similar magnitude impact to a minor sensitivity resource.  As a result, the most significant impact 

to  a  site  of  negligible  sensitivity  is  minor:  a  high  magnitude  impact  to  a  site  of  negligible 

sensitivity is an impact of minor significance. 

 

5.13 Демография, мәдениет және мемлекеттік басқару 

 

1.



 

Workers’ accommodation|: processes and standards: A guidance note by IFC and EBRD (2009) 

 

5.14 Әлеуметтік инфрақұрылым 

 

1.



 

This  is  in  line  with  recognised  best  practice  community  health  and  safety  requirements, 

including those outlined in the IFC’s (2006) Performance Standards on Social and Environmental 

Sustainability 

 

5.15 Экономика, қаражат өмір сүруге, еңбек 

 

1.



 

As outlined in Polymetal’s “Personnel Recruitment Regulation” (2015) 

2.

 

Macfarlane,  M  (2000)  ‘Comparative  Evaluation  of  Socio-economic  Impact  Assessment  in  the 



Mining Sector’ PhD Thesis. University of Bath. 

 

 



 

 


Қызыл жобасының ЭӘӘБ,  

Дереккөздер тізімі 

 

 

ZT52-0156/MM1021 



December 2015 

Final V1.0 

 

Page 5 


 

5.16 Жергілікті тұрғындардың денсаулығы  

 

1.



 

Terlikbayeva A et al 2012 (BMC Infectious Diseases) 

2.

 

WHO: Kazakhstan Tuberculosis Country Profile 



 

5.17 Адам құқығы 

 

1.



 

From Workers’ accommodation: processes and standards (International Finance Corporation 

and 

European 



Bank 

for 


Reconstruction 

and 


Development) 

http://www.ebrd.com/downloads/about/sustainability/Workers_accomodation.pdf

 

 

5.19 Кумулятивті әсер етуді бағалау 



 

1.

 



IFC Performance Standard 1 – Assessment and Management of Environmental and Social Risks 

and Impacts, 2012. 

http://www.ifc.org/wps/wcm/connect/3be1a68049a78dc8b7e4f7a8c6a8312a/PS1_English_2

012.pdf?MOD=AJPERES 

 

8-тарау Қоғамдық тыңдалымдар және ақпаратты ашу 

 

1.



 

Stakeholder  Engagement:  A  Good  Practice  Handbook  for  Companies  Doing  Business  in 

Emerging Markets (2007) IFC 


Chapter 3 Appendices

Appendix 3.2: Project Execution Schedule

Drawing 3.2c -- Auezov Infrastructure Development Schedule

Construction

External transportation lines

By-pass general-purpose road (Bakyrchik – Bursak)



External utilities

Power networks. 110kV single-circuit power line.

Branch line from L-479 power line to new GPP-110/35/6kV

Power networks. 110-35kV double circuit power line.

110kV branch line from L-178 power line and 35kV branch line from

L-84С power line to new GPP-110/35/6kV

Power networks. 35kV single-circuit power line.

35kV branch line from 110-35kV double-circuit power line

Household and drinking water supply pipeline from Kyzyltu intake

(subsurface piping, L=6900 m)



Utilities of Auezov Town (Phase 1)

Feeder power and lighting networks of facilities, located in

from GPP110/35/6kV to 6 kV indoor switchgear , 6 kV power line to Auezov’s

facilities.

Auezov's boiler house with flue gas stack, including: boiler house,

coal storage, ash storage

Heat supply networks

(from Auezov’s boiler house to TK-21, L=790 m )

Household and drinking water supply networks – Auezov’s boiler house

(L=500 m)

Household sewer networks – Auezov’s boiler house

(L=150 m)

Household and drinking water supply pipeline from the site to

pumping and filtration plant (subsurface piping, L=1000 m)

Auezov's water tower

Household and drinking water supply networks – Auezov's water tower

(L=200 m)

Existing facilities

Mine rescue team building

(will be reconstructed as sanitary and amenity building for OP and UG periods - Phase 1)

Office building (old)

(will be renovated and used as office building - Phase 1)

Main fan unit (used as temporary buildings and facilities

during the construction period. To be dismantled in 2018)

Facilities subject to dismantling

300 m3 water tower

(to be dismantled in 2016)

Skipovaya Shaft pithead buildings

(to be dismantled)

Skipovaya Shaft hoist building

(to be dismantled)

Gas supply facilities of sulphide ore process plant

(to be dismantled in 2015)

Ore preparation building

(used as temporary buildings and facilities during the construction period.

To be dismantled in 2018)

Ore-roasting kiln

(to be dismantled in 2015)

Building of dust control shop

(to be dismantled in 2015)

Building of heavy fuel oil handling facilities

(to be dismantled in 2015)

Control board room

(to be dismantled in 2015)

Cooling tower with compressor station

(to be dismantled in 2015)

Drainage pumphouse

Water recycle pumphouse

Building of uncompleted process plant

(to be dismantled in 2015)

Private fuel-filling station

(to be dismantled in 2015)

Crusher building of sulphide ore process plant

(used as temporary buildings and facilities during the construction period.

To be dismantled in 2018)

Gallery and hopper - sulphide ore process plant

(to be dismantled in 2015)

Process plant building

(used as temporary buildings and facilities during the construction period.

To be dismantled in 2018)

Oxide ore storage building

(to be dismantled in 2015)

Mine office and amenity building

(to be dismantled in 2015)

Central boiler house, including:

buildings of wet slag and ash removal, multicyclone device, lifting gallery, garage,

boiler room, salts wet and dry storage areas, flue gas stack (Н=60m), fencing.

(to be dismantled in 2016-2017)

Repair shops building

(to be dismantled in 2017)

Power networks. 110kV power line ( L=7550 m)

(to be dismantled in 2016-2017 after construction of new main step-down transformer

substation (GPP))

Power networks. 110-35kV power line to Auezov Town (L=600 m),

(to be dismantled in 2016-2017 after construction of new main step-down transformer

substation (GPP))

Power networks. 35kV power line (L=2610 m)

(to be dismantled in 2016-2017 after construction of new main step-down transformer

substation (GPP))

GPP110/35/6kV main step-down transformer substation,

to be used before commissioning new GPP, then as:

Indoor switchgear building

(used as temporary buildings and facilities during the construction period.

To be dismantled in 2018)

Pilot plant building

(to be dismantled in 2017)

Ore kiln discharge area

(used as temporary buildings and facilities during the construction period.

To be dismantled in 2018)

Calcine cooling area

(used as temporary buildings and facilities during the construction period.

To be dismantled in 2018)

Main compressor plant

(used as temporary buildings and facilities during the construction period.

To be dismantled in 2018)

Fencing of highly toxic substances storage

(used as temporary buildings and facilities during the construction period.

To be dismantled in 2018)



Legend:

construction period for capital facilities

reconstruction and reequipment period for existing buildings and facilities

lifetime of capital facilities

dismantling period for existing buildings and facilities

recultivation period for the mine and process plant facilities



2040

2039

2033

2034

2035

2036

2037

2038

2027

2028

2029

2030

2031

2032

2021

Implementation Schedule for the Bakyrchik Mine and Process Plant Construction (Bakyrchik Gold Project)

2020

2015

2016

2017

2018

2019

2022

2023

2024

2025

2026

Infrastructure and Utilities of Auezov Town and Existing Facilities

Drawing 3.2b -- Stage 2 Underground Mining Schedule

Construction - buildings, structures, utilities

Mining facilities (Phase 2)

Mine site

Lamp room

Cement storage silos - backfill plant

Buffer tank of thickened tailings -backfill plant

Pulp supply pipeline - backfill plant

Water supply pipeline - backfill plant

Backfill supply pipeline

Power networks. 6kV power line to backfill plant

6/0.4kV external package transformer substation of backfill plant

Central and Western areas

Western area

Mine site. Western area.

Undeground mining.

Western Ventilation Shaft, +385m elevation

(reeconstruction)

Pithead building of Western Ventilation Shaft

Main fan unit No1

MTEU-VNU 075×4 power supply unit, including air heating unit

870 t coal storage (Main fan unit No1)

Ash storage (Main fan unit No1)

Pumphouse No1 with water tanks - process and fire water supply

Storage No1 - fire fighting supplies and equipment

Western vent raise, +385 m elevation

Western vent raise opening, +385 m elevation

Backfill supply drill hole No1, collar, +385 m elevation

Feeder power and lighting networks of the Western area, including:

1.Power networks. 6kV power line to Main Fan Unit No1 of

the Western area.

2.Power networks. 6 kV power line to power supply unit of Main fan unit No 1 of

the Western area.

3.6/0.4kV external package transformer substation for power supply unit of

the Western area.

4.Power networks. 6kV power line

Western vent raise, +385 m elevation (UG).

5.Power networks. 6 kV power line from 2КTP-10000-35/6kV Central area

transformer substation to the Western area.

6.PKTPN 6 300-35/6 kV Transformer substation No 2 of the Western area.

the Western area (transfered from the Western area of Phase 1)

7.Power networks. 35 kV power line to PKTPN 6 300-35/6 kV Transformer

substation No 2.



Central area

Mine site. Central area.

Undeground mining.

Capital Shaft, +410 m elevation

(reconstruction)

Pithead building of Capital Shaft

(reconstruction)

Capital Shaft hoist building

(reconstruction)

Main fan unit No 3

MTEU-VNU 10×4 power supply unit, including air heating unit

1330 t coal storage (Main fan unit No 3)

Ash storage (Main fan unit No3)

Pumphouse No 2 with water tanks - process and fire water supply

Storage No 3 - fire fighting supplies and equipment

Heat supply network - Central adit, +180 m elevation

Heat supply network - Central adit portal, +180 m elevation

Storage No 4 - fire fighting supplies and equipment

Utilities 1 - Central adit, +180 m elevation

Utilities 1 - Central adit portal, +180 m elevation

Utilities 2 - Central adit, +150 m elevation

Utilities 2 - Central adit portal, +150 m elevation

Storage No 5 - fire fighting supplies and equipment

Backfill supply drill hole No 2, collar, +402 m elevation

Ore handling stockpile No1

Open pit water drainage pipeline for process needs

L=4550m

Feeder power and lighting networks of the Central area, including:



1.2КTP-10000-35/6kV package two-transformer substation of

the Central area.

2. Power networks. Two 35kV power lines to

2КTP-10000-35/6kV transformer substation of the Central area.

3.Power networks. 6 kV power line to Main fan unit No 3 of

the Central area.

4.Power networks. 6 kV power line to power supply unit of Main fan unit No 3 of

the Central area.

5.6/0.4kV external package transformer substation for

power supply unit of the Central area.

6.Power networks. 6kV power line to

Capital Shaft hoist

7. Power networks. 6kV power line to

Utilities 2 - Central adit

8.Power networks. 6kV power line to 6/0.4kV external package transformer

substation of open pit drainage system - Dewatering area No 2.

9.6/0.4kV external package transformer substation of open pit drainage system –

Dewatering area No 2.



Eastern area

Mine site. Eastern area.

Undeground mining.

Eastern Ventilation Shaft, +435m elevation

Pithead building of Eastern Ventilation Shaft

Main fan unit No 2

MTEU-VNU 10х4 power supply unit, including air heating unit

630 t coal storage (Main fan unit No 2)

Ash storage (Main fan unit No2)

Pumphouse No 3 with water tanks - process and fire water supply

process and fire water supply

Storage No 2 - fire fighting supplies and equipment

Heat supply network - Eastern adit, +250 m elevation

Heat supply network - Eastern adit portal, +250 m elevation

Storage No 6 - fire fighting supplies and equipment

Utilities 1 - Eastern adit, +250 m elevation

Utilities 1 - Eastern adit portal, +250 m elevation

Utilities 2 - Eastern adit, +253 m elevation

Utilities 2 - Eastern adit portal, +253 m elevation

Storage No 7 - fire fighting supplies and equipment

Backfill supply drill hole No 3, collar, +435 m elevation

Ore handling stockpile No 2

Feeder power and lighting networks of the Eastern area, including:

1.Power networks. 6kV power line to 6/0.4kV external package

transformer substation of open pit drainage system - Dewatering area No 1.

2.6/0.4kV external package transformer substation of open pit drainage system –

Dewatering area No 1.

3.Power networks. 6 kV power line to Main fan unit No 2 of

the Eastern area.

4.Power networks. 6 kV power line to power supply unit of Main fan unit No 2 of

the Eastern area.

5.6/0.4kV external package transformer substation for power supply unit of

the Eastern area;

6.Power networks. 6kV power line to

Utilities 2 - Eastern adit

7.Power networks. 6 kV power line from 2КTP-10000-35/6kV Central area

transformer substation to the Eastern area.

8.PKTPN 6 300-35/6 kV Transformer substation No 1 of the Eastern area

(operates at the same location as for Phase 1)

Office and amenity block

Sanitary and amenity building (SAB UG)



Utilities

(water and gas supply pipelines, sewage system and

other networks, including inter-site ones)

Household and drinking water

storage tanks

Household and drinking water supply networks

L=700

Household sewer networks



L=300

Heat supply networks

L=1250

Inter-site transportation lines

Road (road fork - Central area)

Road (fork of Central area road - Western area)

Road (fork of Central area road - Eastern area)



Existing facilities

Ore kiln charging area (To be reconstructed and used for

backfill mixture preparation - Phase 1)

Mine water treatment station

(to be used for OP and UG periods)

Legend:

construction period for capital facilities

reconstruction and reequipment period for existing buildings and facilities

lifetime of capital facilities

dismantling period for existing buildings and facilities

recultivation period for the mine and process plant facilities



2040

2020

2015

2016

2017

2018

2019

2039

2033

2034

2035

2036

2037

2038

2032

2021

Implementation Schedule for the Bakyrchik Mine and Process Plant Construction (Bakyrchik Gold Project)

Phase 2 - Underground Mining

2031

2023

2024

2025

2026

2022

2027

2028

2029

2030

Drawing 3.2a -- Stage 1 Open Pit Mining Schedule

Construction - buildings, structures, utilities

Mining facilities (Phase 1)

Open pit

Open pit


Heating room and canteen for workers

Waste dump

Ore stockpile (buffer)

Pumphouse for buffer ore stockpile drainage water

Open pit dewatering –Area No1

Open pit dewatering – Area No 2

Settling sump No1

Drainage ditch No 1

Drainage ditch No 2

Settling sump No2

                    

Water diversion channel of the Akbastaubulak and Kyzyltu Streams

Protection dike No1

Protection dike No 2

Top soil storage

Dam of pit drainage water settling sump

Pumphouse of pit drainage water settling sump

Pressure pipeline network for open pit drainage water

Fresh water supply pipeline to tailing storage

Ore processing facilities (Phase 1)

Ore preparation facility, including:

Primary/course crushing plant with trestle of Conveyor No1

Crushed ore stockpile, with gallery of Conveyor No 2

Process plant

Tailings thickener, D=32 m

Recycle water tank

Laboratory

Finished concentrate storage

Carbon concentrate storage



Tailings storage,

including:

Bund wall No1

Bund wall No 2

(reconstruction)

Waterproof liner of tailings storage bed

Stream diversion channel

Upstream wall No1

(reconstruction)

Upstream wall No2

Water diversion ditch

Recycle water pumphouse

Recycle water pipeline (the 1st and 2nd stages)

the 1st stage

the 2nd stage

Pulp pipeline (right and left runs)

Drainage system with pumphouse




Достарыңызбен бөлісу:
1   ...   74   75   76   77   78   79   80   81   ...   95




©emirsaba.org 2024
әкімшілігінің қараңыз

    Басты бет