5-тарау Экологиялық және әлеуметтік әсерді бағалау (ЭӘӘБ)
5.2 Бағалаудың жалпы әдістемесі
1.
IAIA (2000) Development of SIA. Web Page. www.ext.nodak.edu/IAIA
2.
Vanclay, F. (2000) Social Impact Assessment. In Handbook of Environmental Impact Assessment,
Vol. 1 (ed. J. Petts), pp. 301-326. Oxford: Blackwell Science.
3.
Barrow, C (1997) Environmental and Social Impact Assessment. London: Arnold.
5.4 Парниктік газдарды шығару және климатты өзгерту
1.
International Finance Corporation (IFC). 2012. IFC Performance Standards on Environmental
and Social Sustainability. January 2012.
2.
“Environmental Assessment (Summary)” Asian Development Bank - Country Partnership
Strategy: Kazakhstan 2012–2016, based on Asian Development Bank. 2011. Country
Environment Note-Kazakhstan; Analytical Report on Climate Change Impacts and Response
Measures (Kazakhstan); and Climate Risk Management and Adaptation Roadmap. Manila
(unpublished consultant’s reports, November)
3.
World Business Council for Sustainable Development (WBCSD), World Resource Institute (WRI).
2004. GHG Protocol: Corporate Accounting and Reporting Standard. 2004
4.
“Carbon Emission Factors Report for Kazakhstan” European Bank for Reconstruction and
Development (EBRD) commissioned report produced by Laymeyer International, 2012 (LI
260574)
5.
Bakyrchik Mining Venture LLC, "The Bakyrchik Gold Deposit Mine and Process Plant
Construction Feasibility Report - Volume 5: Infrastructure and power supply system" Polymetal
Engineering JSC, St Petersburg, 2015 (Table 1.1, page 27)
6.
“Carbon Emission Factors Report for Kazakhstan” European Bank for Reconstruction and
Development (EBRD) commissioned report produced by Laymeyer International, 2012 (LI
260574)
7.
Second National Communication of the Republic of Kazakhstan to the Conference of the Parties
of the United Nations Framework Convention on Climate Change (UNFCCC), 2009
5.5 Геохимиялық әсерді бағалау
1.
International Finance Corporation (IFC). 2012. IFC Performance Standards on Environmental
and Social Sustainability. January 2012
5.6 Ауаның сапасы
1.
Significance in Air Quality, Institute of Air Quality Management (2009)
Қызыл жобасының ЭӘӘБ,
Дереккөздер тізімі
ZT52-0156/MM1021
December 2015
Final V1.0
Page 4
2.
Bakyrchik Mining Venture LLC, The Bakyrchik Gold Deposit, MINE AND PROCESS PLANT
CONSTRUCTION, 34.01.06.001.00 PZ3, St Petersburg, 2015
3.
Design Manual for Roads and Bridges (Volume 11, Section 3, Part 1, HA 207/07
5.7 Шу әсерін бағалау
1.
Acoustics -- Attenuation of sound during propagation outdoors -- Part 2: General method of
calculation, ISO9613-2:1996
5.10.Биоәртүрлілік
1.
IFC, (2012), IFC Performance Standards on Environmental and Social Sustainability,
www.ifc.org
5.11 Археология және мәдени мұра
1.
International Finance Corporation (IFC). 2012. IFC Performance Standards on Environmental
and Social Sustainability. January 2012
2.
The methodology for assessing impact significance in Section 6.2 does not include a receptor
sensitivity level of negligible. For the purposes of this analysis, the significance of impacts to
cultural heritage resources of negligible sensitivity will be assessed as one degree lower than a
similar magnitude impact to a minor sensitivity resource. As a result, the most significant impact
to a site of negligible sensitivity is minor: a high magnitude impact to a site of negligible
sensitivity is an impact of minor significance.
5.13 Демография, мәдениет және мемлекеттік басқару
1.
Workers’ accommodation|: processes and standards: A guidance note by IFC and EBRD (2009)
5.14 Әлеуметтік инфрақұрылым
1.
This is in line with recognised best practice community health and safety requirements,
including those outlined in the IFC’s (2006) Performance Standards on Social and Environmental
Sustainability
5.15 Экономика, қаражат өмір сүруге, еңбек
1.
As outlined in Polymetal’s “Personnel Recruitment Regulation” (2015)
2.
Macfarlane, M (2000) ‘Comparative Evaluation of Socio-economic Impact Assessment in the
Mining Sector’ PhD Thesis. University of Bath.
Қызыл жобасының ЭӘӘБ,
Дереккөздер тізімі
ZT52-0156/MM1021
December 2015
Final V1.0
Page 5
5.16 Жергілікті тұрғындардың денсаулығы
1.
Terlikbayeva A et al 2012 (BMC Infectious Diseases)
2.
WHO: Kazakhstan Tuberculosis Country Profile
5.17 Адам құқығы
1.
From Workers’ accommodation: processes and standards (International Finance Corporation
and
European
Bank
for
Reconstruction
and
Development)
http://www.ebrd.com/downloads/about/sustainability/Workers_accomodation.pdf
5.19 Кумулятивті әсер етуді бағалау
1.
IFC Performance Standard 1 – Assessment and Management of Environmental and Social Risks
and Impacts, 2012.
http://www.ifc.org/wps/wcm/connect/3be1a68049a78dc8b7e4f7a8c6a8312a/PS1_English_2
012.pdf?MOD=AJPERES
8-тарау Қоғамдық тыңдалымдар және ақпаратты ашу
1.
Stakeholder Engagement: A Good Practice Handbook for Companies Doing Business in
Emerging Markets (2007) IFC
Chapter 3 Appendices
Appendix 3.2: Project Execution Schedule
Drawing 3.2c -- Auezov Infrastructure Development Schedule
Construction
External transportation lines
By-pass general-purpose road (Bakyrchik – Bursak)
External utilities
Power networks. 110kV single-circuit power line.
Branch line from L-479 power line to new GPP-110/35/6kV
Power networks. 110-35kV double circuit power line.
110kV branch line from L-178 power line and 35kV branch line from
L-84С power line to new GPP-110/35/6kV
Power networks. 35kV single-circuit power line.
35kV branch line from 110-35kV double-circuit power line
Household and drinking water supply pipeline from Kyzyltu intake
(subsurface piping, L=6900 m)
Utilities of Auezov Town (Phase 1)
Feeder power and lighting networks of facilities, located in
from GPP110/35/6kV to 6 kV indoor switchgear , 6 kV power line to Auezov’s
facilities.
Auezov's boiler house with flue gas stack, including: boiler house,
coal storage, ash storage
Heat supply networks
(from Auezov’s boiler house to TK-21, L=790 m )
Household and drinking water supply networks – Auezov’s boiler house
(L=500 m)
Household sewer networks – Auezov’s boiler house
(L=150 m)
Household and drinking water supply pipeline from the site to
pumping and filtration plant (subsurface piping, L=1000 m)
Auezov's water tower
Household and drinking water supply networks – Auezov's water tower
(L=200 m)
Existing facilities
Mine rescue team building
(will be reconstructed as sanitary and amenity building for OP and UG periods - Phase 1)
Office building (old)
(will be renovated and used as office building - Phase 1)
Main fan unit (used as temporary buildings and facilities
during the construction period. To be dismantled in 2018)
Facilities subject to dismantling
300 m3 water tower
(to be dismantled in 2016)
Skipovaya Shaft pithead buildings
(to be dismantled)
Skipovaya Shaft hoist building
(to be dismantled)
Gas supply facilities of sulphide ore process plant
(to be dismantled in 2015)
Ore preparation building
(used as temporary buildings and facilities during the construction period.
To be dismantled in 2018)
Ore-roasting kiln
(to be dismantled in 2015)
Building of dust control shop
(to be dismantled in 2015)
Building of heavy fuel oil handling facilities
(to be dismantled in 2015)
Control board room
(to be dismantled in 2015)
Cooling tower with compressor station
(to be dismantled in 2015)
Drainage pumphouse
Water recycle pumphouse
Building of uncompleted process plant
(to be dismantled in 2015)
Private fuel-filling station
(to be dismantled in 2015)
Crusher building of sulphide ore process plant
(used as temporary buildings and facilities during the construction period.
To be dismantled in 2018)
Gallery and hopper - sulphide ore process plant
(to be dismantled in 2015)
Process plant building
(used as temporary buildings and facilities during the construction period.
To be dismantled in 2018)
Oxide ore storage building
(to be dismantled in 2015)
Mine office and amenity building
(to be dismantled in 2015)
Central boiler house, including:
buildings of wet slag and ash removal, multicyclone device, lifting gallery, garage,
boiler room, salts wet and dry storage areas, flue gas stack (Н=60m), fencing.
(to be dismantled in 2016-2017)
Repair shops building
(to be dismantled in 2017)
Power networks. 110kV power line ( L=7550 m)
(to be dismantled in 2016-2017 after construction of new main step-down transformer
substation (GPP))
Power networks. 110-35kV power line to Auezov Town (L=600 m),
(to be dismantled in 2016-2017 after construction of new main step-down transformer
substation (GPP))
Power networks. 35kV power line (L=2610 m)
(to be dismantled in 2016-2017 after construction of new main step-down transformer
substation (GPP))
GPP110/35/6kV main step-down transformer substation,
to be used before commissioning new GPP, then as:
Indoor switchgear building
(used as temporary buildings and facilities during the construction period.
To be dismantled in 2018)
Pilot plant building
(to be dismantled in 2017)
Ore kiln discharge area
(used as temporary buildings and facilities during the construction period.
To be dismantled in 2018)
Calcine cooling area
(used as temporary buildings and facilities during the construction period.
To be dismantled in 2018)
Main compressor plant
(used as temporary buildings and facilities during the construction period.
To be dismantled in 2018)
Fencing of highly toxic substances storage
(used as temporary buildings and facilities during the construction period.
To be dismantled in 2018)
Legend:
construction period for capital facilities
reconstruction and reequipment period for existing buildings and facilities
lifetime of capital facilities
dismantling period for existing buildings and facilities
recultivation period for the mine and process plant facilities
2040
2039
2033
2034
2035
2036
2037
2038
2027
2028
2029
2030
2031
2032
2021
Implementation Schedule for the Bakyrchik Mine and Process Plant Construction (Bakyrchik Gold Project)
2020
2015
2016
2017
2018
2019
2022
2023
2024
2025
2026
Infrastructure and Utilities of Auezov Town and Existing Facilities
Drawing 3.2b -- Stage 2 Underground Mining Schedule
Construction - buildings, structures, utilities
Mining facilities (Phase 2)
Mine site
Lamp room
Cement storage silos - backfill plant
Buffer tank of thickened tailings -backfill plant
Pulp supply pipeline - backfill plant
Water supply pipeline - backfill plant
Backfill supply pipeline
Power networks. 6kV power line to backfill plant
6/0.4kV external package transformer substation of backfill plant
Central and Western areas
Western area
Mine site. Western area.
Undeground mining.
Western Ventilation Shaft, +385m elevation
(reeconstruction)
Pithead building of Western Ventilation Shaft
Main fan unit No1
MTEU-VNU 075×4 power supply unit, including air heating unit
870 t coal storage (Main fan unit No1)
Ash storage (Main fan unit No1)
Pumphouse No1 with water tanks - process and fire water supply
Storage No1 - fire fighting supplies and equipment
Western vent raise, +385 m elevation
Western vent raise opening, +385 m elevation
Backfill supply drill hole No1, collar, +385 m elevation
Feeder power and lighting networks of the Western area, including:
1.Power networks. 6kV power line to Main Fan Unit No1 of
the Western area.
2.Power networks. 6 kV power line to power supply unit of Main fan unit No 1 of
the Western area.
3.6/0.4kV external package transformer substation for power supply unit of
the Western area.
4.Power networks. 6kV power line
Western vent raise, +385 m elevation (UG).
5.Power networks. 6 kV power line from 2КTP-10000-35/6kV Central area
transformer substation to the Western area.
6.PKTPN 6 300-35/6 kV Transformer substation No 2 of the Western area.
the Western area (transfered from the Western area of Phase 1)
7.Power networks. 35 kV power line to PKTPN 6 300-35/6 kV Transformer
substation No 2.
Central area
Mine site. Central area.
Undeground mining.
Capital Shaft, +410 m elevation
(reconstruction)
Pithead building of Capital Shaft
(reconstruction)
Capital Shaft hoist building
(reconstruction)
Main fan unit No 3
MTEU-VNU 10×4 power supply unit, including air heating unit
1330 t coal storage (Main fan unit No 3)
Ash storage (Main fan unit No3)
Pumphouse No 2 with water tanks - process and fire water supply
Storage No 3 - fire fighting supplies and equipment
Heat supply network - Central adit, +180 m elevation
Heat supply network - Central adit portal, +180 m elevation
Storage No 4 - fire fighting supplies and equipment
Utilities 1 - Central adit, +180 m elevation
Utilities 1 - Central adit portal, +180 m elevation
Utilities 2 - Central adit, +150 m elevation
Utilities 2 - Central adit portal, +150 m elevation
Storage No 5 - fire fighting supplies and equipment
Backfill supply drill hole No 2, collar, +402 m elevation
Ore handling stockpile No1
Open pit water drainage pipeline for process needs
L=4550m
Feeder power and lighting networks of the Central area, including:
1.2КTP-10000-35/6kV package two-transformer substation of
the Central area.
2. Power networks. Two 35kV power lines to
2КTP-10000-35/6kV transformer substation of the Central area.
3.Power networks. 6 kV power line to Main fan unit No 3 of
the Central area.
4.Power networks. 6 kV power line to power supply unit of Main fan unit No 3 of
the Central area.
5.6/0.4kV external package transformer substation for
power supply unit of the Central area.
6.Power networks. 6kV power line to
Capital Shaft hoist
7. Power networks. 6kV power line to
Utilities 2 - Central adit
8.Power networks. 6kV power line to 6/0.4kV external package transformer
substation of open pit drainage system - Dewatering area No 2.
9.6/0.4kV external package transformer substation of open pit drainage system –
Dewatering area No 2.
Eastern area
Mine site. Eastern area.
Undeground mining.
Eastern Ventilation Shaft, +435m elevation
Pithead building of Eastern Ventilation Shaft
Main fan unit No 2
MTEU-VNU 10х4 power supply unit, including air heating unit
630 t coal storage (Main fan unit No 2)
Ash storage (Main fan unit No2)
Pumphouse No 3 with water tanks - process and fire water supply
process and fire water supply
Storage No 2 - fire fighting supplies and equipment
Heat supply network - Eastern adit, +250 m elevation
Heat supply network - Eastern adit portal, +250 m elevation
Storage No 6 - fire fighting supplies and equipment
Utilities 1 - Eastern adit, +250 m elevation
Utilities 1 - Eastern adit portal, +250 m elevation
Utilities 2 - Eastern adit, +253 m elevation
Utilities 2 - Eastern adit portal, +253 m elevation
Storage No 7 - fire fighting supplies and equipment
Backfill supply drill hole No 3, collar, +435 m elevation
Ore handling stockpile No 2
Feeder power and lighting networks of the Eastern area, including:
1.Power networks. 6kV power line to 6/0.4kV external package
transformer substation of open pit drainage system - Dewatering area No 1.
2.6/0.4kV external package transformer substation of open pit drainage system –
Dewatering area No 1.
3.Power networks. 6 kV power line to Main fan unit No 2 of
the Eastern area.
4.Power networks. 6 kV power line to power supply unit of Main fan unit No 2 of
the Eastern area.
5.6/0.4kV external package transformer substation for power supply unit of
the Eastern area;
6.Power networks. 6kV power line to
Utilities 2 - Eastern adit
7.Power networks. 6 kV power line from 2КTP-10000-35/6kV Central area
transformer substation to the Eastern area.
8.PKTPN 6 300-35/6 kV Transformer substation No 1 of the Eastern area
(operates at the same location as for Phase 1)
Office and amenity block
Sanitary and amenity building (SAB UG)
Utilities
(water and gas supply pipelines, sewage system and
other networks, including inter-site ones)
Household and drinking water
storage tanks
Household and drinking water supply networks
L=700
Household sewer networks
L=300
Heat supply networks
L=1250
Inter-site transportation lines
Road (road fork - Central area)
Road (fork of Central area road - Western area)
Road (fork of Central area road - Eastern area)
Existing facilities
Ore kiln charging area (To be reconstructed and used for
backfill mixture preparation - Phase 1)
Mine water treatment station
(to be used for OP and UG periods)
Legend:
construction period for capital facilities
reconstruction and reequipment period for existing buildings and facilities
lifetime of capital facilities
dismantling period for existing buildings and facilities
recultivation period for the mine and process plant facilities
2040
2020
2015
2016
2017
2018
2019
2039
2033
2034
2035
2036
2037
2038
2032
2021
Implementation Schedule for the Bakyrchik Mine and Process Plant Construction (Bakyrchik Gold Project)
Phase 2 - Underground Mining
2031
2023
2024
2025
2026
2022
2027
2028
2029
2030
Drawing 3.2a -- Stage 1 Open Pit Mining Schedule
Construction - buildings, structures, utilities
Mining facilities (Phase 1)
Open pit
Open pit
Heating room and canteen for workers
Waste dump
Ore stockpile (buffer)
Pumphouse for buffer ore stockpile drainage water
Open pit dewatering –Area No1
Open pit dewatering – Area No 2
Settling sump No1
Drainage ditch No 1
Drainage ditch No 2
Settling sump No2
Water diversion channel of the Akbastaubulak and Kyzyltu Streams
Protection dike No1
Protection dike No 2
Top soil storage
Dam of pit drainage water settling sump
Pumphouse of pit drainage water settling sump
Pressure pipeline network for open pit drainage water
Fresh water supply pipeline to tailing storage
Ore processing facilities (Phase 1)
Ore preparation facility, including:
Primary/course crushing plant with trestle of Conveyor No1
Crushed ore stockpile, with gallery of Conveyor No 2
Process plant
Tailings thickener, D=32 m
Recycle water tank
Laboratory
Finished concentrate storage
Carbon concentrate storage
Tailings storage,
including:
Bund wall No1
Bund wall No 2
(reconstruction)
Waterproof liner of tailings storage bed
Stream diversion channel
Upstream wall No1
(reconstruction)
Upstream wall No2
Water diversion ditch
Recycle water pumphouse
Recycle water pipeline (the 1st and 2nd stages)
the 1st stage
the 2nd stage
Pulp pipeline (right and left runs)
Drainage system with pumphouse