«полиметалл» АҚ Қызыл жобасының ЭӘӘБ


Repair and maintenance facilities (Phase 1)



Pdf көрінісі
бет79/95
Дата06.03.2017
өлшемі57,11 Mb.
#7962
1   ...   75   76   77   78   79   80   81   82   ...   95

Repair and maintenance facilities (Phase 1)

Repair shops

Outdoor repair and mounting area

Storage facilities (Phase 1)

Reagent storage, including:

Reagent container storage area

Hangar No1

Hangar No 2

Decontainerization area

Office building

Ammonium nitrate storage, including:

Stacked ammonium nitrate storage area

Mixing and charging machine loading station

Mixing and charging machine parking lot

Fire water tanks

Fuel and lubricants storage, including:

Tank farm

Loading/unloading site

Service building

Drummed oil storage area

Empty drum storage area

Diesel fuel filling station

Container-type petrol filling station

Process pipelines

Emergency oil collection tanks (2 units)

Fencing

Explosives storage



24 t explosives storage site, including:

Explosives container storage site (2 units)

Room for initiating devices storage

Explosives preparation and distribution building

Laboratory

Store-house of fire-fighting means

Packing storage

Watch tower

Office building

Guardhouse

Heating room and canteen for workers

Empty container storage site

Explosives test and destruction range, including:

Explosives test and destruction area

Shot-firer safe location

Fencing


Materials and equipment outdoor storage

Heat and power supply facilities (Phase 1)

Boiler house with flue gas stack, including: boiler house, coal storage and

ash storage

GPP-110/35/6kV main step-down

transformer substation

Power networks. 35 kV power line to

PKTPN 6 300-35/6 kV Transformer substation No 1

Power networks. 35 kV power line to

PKTPN 6 300-35/6 kV Transformer substation No 2

Open pit feeder power and lighting networks, including:

PKTPN 6 300-35/6 kV Transformer substations No 1 and No 2, 6kV power line to

excavators, 6kV power line to 6/0.4kV external package transformer substation of open

pit drainage system pumphouses (Areas No 1 and No2), external package transformer

substation for open pit and waste dump lighting (16 units, mobile light lines)

Mine site feeder power and lighting networks, including:

6kV package outdoor switchgear

at the mine site

Power networks. 6kV power line from 6kV package outdoor switchgear to

6/0.4 kV power distribution unit at the mine site (L=600 m)

6/0.4kV external package transformer substations at

the mine site and infrastructure facilities:

1х1000 - primary/coarse crushing plant 

2х400 - laboratory

2х400 - boiler house with flue gas stack

2х630 - repair shops

2х100 - reagent storage

2х63 - explosives storage

2х63 - ammonium nitrate storage

2х250 - fuel and lubricants storage 

2х250 - recycle water pumphouse

1х63 - drainage pumphouse

 2х250 - treatment facilities

Power networks. 6kV power line to 6/0.4kV external package transformer

substation of the mine site and infrastructure facilities (L=7900 m)

Feeder power and lighting networks of the sanitary and amenity building, including:

1. Power networks. 6kV power line to 6/0.4kV external package

transformer substation of the the sanitary and amenity building (L=400 m)

2.6/0.4kV external package transformer substation of

the sanitary and amenity building

5. Power networks. 6kV power line to 6/0.4kV external package transformer

substation of the pumphouse for household and drinking water supply (L=400м)

6. 6/0.4kV external package transformer substation of the pumphouse for

household and drinking water supply

Feeder power and lighting networks at the pit drainage settling sump,

including:

1.6/0.4kV external package transformer substation of the pumphouse

at the pit drainage settling sump

2.Power networks. 6kV power line to the pumphouse

at the pit drainage settling sump

Power networks. 6kV power line to Capital Shaft

(switching of existing mine drainage system)

Utility facilities

(water and gas supply pipelines, sewage system and other networks,

including inter-site ones)

Pumphouse with water tanks - process and fire water supply

Pumphouse with water tanks - household and drinking water supply,

household and drinking water supply area fencing

Treatment facilities for household sewage

Treatment facilities for surface runoff of the fuel and lubricants storage

Surface water gathering pond

Sewage pump station

Household and drinking water supply systems,

(subsurface piping, L=2400 m)

Process and fire water supply systems

(subsurface piping, L=1750 m)

Household sewer systems

(subsurface piping, L=1100 m)

Heat supply networks

(surface piping, L=2550 m)



Inter-site transportation lines

Access road

(open pit western exit – waste dump)

Access road

(open pit eastern exit – waste dump)

Access road

(open pit eastern exit – buffer ore stockpile)

Support road

(buffer ore stockpile – repair and storage facilities)

Support road

(buffer ore stockpile – carbon concentrate storage)

Support road

(road fork - existing road)

Support road

(top soil storage – explosives test and destruction range)

Support road

(top soil storage – explosives storage)

Office and amenity block

Canteen for 100 seats



Security and fire-fighting facilities

Legend:

construction period for capital facilities

reconstruction and reequipment period for existing buildings and facilities

lifetime of capital facilities

dismantling period for existing buildings and facilities

recultivation period for the mine and process plant facilities



2040

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2033

2039

2034

2035

2036

2037

2038

Phase 1 - Open Pit Mining

Implementation Schedule for the Bakyrchik Mine and Process Plant Construction (Bakyrchik Gold Project)

2030

2031

2032

Appendix 3.3: Open Pit Waste dump Development

Drawing 3.3: Illustration of Open pit and waste development year by year

Appendix 3.4: Underground Mine Development

3D view of the open pit (coloured reddish-brown), and the extent of the western, central, and eastern deposits underground (coloured grey). The green lines show the routes (haulage declines) that underground haul vehicles will take

to bring ore to the surface, at the bottom of the pit. It also shows the routes the ventilation network will take through the mine. Fresh air will be pumped into the mine via the routes shown in blue, while stale air will be pumped back

out to surface along the routes shown in red. Historic underground mining infrastructure is also shown (grey lines).

DRAWING 3.4: Underground Mine Development

Return air drives

Haulage declines

Fresh air drives

Return air drives

Haulage declines

Fresh air drives

Haulage declines

Fresh air drives

Return air drives

East Ventilation

Shaft


West Ventilation

Shaft


West Ventilation

Raise


Capital Shaft

Skip Shaft

East area

Central area

West area


Appendix 3.5: Water Balance - Open Pit

Рисунок 3.1  - Балансовая схема  водопотребления и водоотведения в период отработки месторождения открытыми горными работами 

Water intake

34260 m3/year

Boiler-house make-up

900 m3/year

Vehicle wash recycle water 

system make-up

2560m3/year

Process and 

fire water 

pumphouse

Household 

and potable 

water 


pumphouse

Household and 

potable water 

supply


33360m3/year

With ore


95000m3/year

Process and fire 

water supply

46100m3/year

2560m3/year

Household 

and potable 

water needs

Process plant

16800m3/year

Sewerage 

treatment 

facilities

Losses 


with 

sulphide 

concentrate

Losses


 with 

carbon


concen

trate


20600m3/year

13510m3/year

non-recoverable losses with 

concentrate

34110m3/year

Treated household effluents

16800m3/year

Fuels and lubrucants storage atmospheric precipitation runoff

2800n3/year

Reagents storage and repair and storage area atmospheric precipitation runoff

8200m3/year

Atmospheric precipitation runoff of the process plant area and MTEU-VNU  power supply unit, including air heating 

plant

8800m3/year



Household effluents

16560m3/year

Buffer ore stockpile and carbon concentrate storage runoff

8200m3/year

36000m3/year

Treatment 

facilities

Collecting 

pond

Road and area irrigation 



(non-recoverable losses) 

8800m3/year

To Auezov sewerage network

16560 m3/year

Road irrigation 

(non-recoverable  

losses)

12050m3/year



Open pit water

413000 m3/year

Mine water

377210 m3/year

34510m3/year

Open pit water

48660m3/year

Open pit settling 

pond

332290 m3/year



342700m3/year

Discharge to watercourse

34510m3/year

Fresh water to tailings storage

694990 m3/year

Mine water 

treatment 

plant


Precipitation and evaporation 

balance


224470 m3/year

With tailings 1671 700 m3/year

Recycle water 1564 700 m3/year

Tailings storage

Tailings storage pond 

volume increase

30000 m3/year

Interstices filling losses 

(non-recoverable)

583510 m3/year

The balance is provided for 2025 at the process plant 

operation without concentrate selection

Drawing 3.5: Water consumption and diversion flow chart in the period of the deposit open pit mining

,000 m3/year

1. Water, supplied to the mine and process plant, including:

from Kyzyltu underground water intake

with ore

open pit water

underground mine water

buffer ore stockpile and carbon concentrate storage 

runoff

Mine sites precipitation runoff



2. Mine and process plant effluents, including

household effluents to the Auezov trearment plant

Mine water to a water course

3. non-recoverable losses, including 

road and mine area irrigation

tailings interstices filling

losses with concentrate

boiler house and vehicle wash recycle water

system make up

tailings storage evaporation

(precipitation and evaporation balance

4. Tailings storage pond volume increase



Appendix 3.6: Water Balance - Underground

Рисунок 3.2  - Балансовая схема  водопотребления и водоотведения в период отработки месторождения подземными горными работами 

Water intake

67250 m3/year

Household and 

potable water 

pumphouse

Boiler-house make-up

900 m3/year

Vehicle wash recycle water 

system make up

2560 m3/year

Underground mining 

needs

Process and fire 



water 

pumphouse

627950m3/year

627950m3/year

Open pit water

33310 m3/year

Open pit water 

settling sump

Open pit and underground mine water

2094 000 m3/year

Road irrigation 

(non-recoverable 

losses)

11600 m3/year



Mine water 

treatment 

plant

Discharge to a watercourse



1411500 m3/year

Fresh water to tailings storage

637590 m3/year

Precipitation and evaporation 

balance

248760 m3/year



Losses 

with 


sulphide 

concentrate

Losses 

with 


carbon 

concentrate

with ore

63160 m3/year

Process and fire 

water supply

30750 m3/year

Household and 

potable water supply

66350 m3/year

Household and 

potable water 

needs

21800 m3/year



Process plant

13750m4/year

8870 m3/year

Sewerage 

treatment 

facilities

non-recoverable losses with 

concentrate

22620 m3/year

Treated household effluents

21800 m3/year

Fuels and lubricants storage atmospheric precipitation runoff

Household effluents

2800 m3/year

Reagents storage and repair and storage site atmospheric precipitation runoff

8200 m3/year

Buffer ore stockpile and carbon concentrate storage  precipitation runoff

8200 m3/year

Process plant and MTEU-VNU  power supply unit atmospheric precipitation runoff

8800 m3/year

44550 m3/year

Drawing 3.6: Water Consumption and Diversion Balance Flow Chart in the Period of the Deposit Underground Mining 

with tailings 542480 m3/year

Recycle water 752960 m3/year

with tailings 572090 m3/year

Backfill plant

Recycle water 290320 m3/year

281770m3/year

To backfill 

(non-recoverable losses)

41000 m3/year

Treatment 

facilities

Collecting pond

Tailings storage

Tailings storage pond 

volume increase

30000m3/year

Interstices filling losses 

(non-recoverable)

189350 m3/year

Road and mine areas irrigation

8800 m3/year

To Auezov sewerafe networks

16560 m3/year

Balance is provided for 2027 at the process plant operation without 

concentrate selection

,000 m3/year

1. Water, supplied to the mine and process plant, including:

from Kyzyltu underground water intake

with ore

Open pit and underground mine water

Mine sites atmospheric precipitation runoff

Buffer ore stockpile and carbon concentrate storage

atmospheric precipitation runoff

2. Mine and process plant effluents, including:

household effluents to Auezov treatment plant

Open pit and mine water to watercourse

3. Non-recoverable losses, including:

tailings storage evaporation

(precipitation and evaporation balance)

road and mine areas irrigation

tailings interstices filling losses

losses with concentrate

losses in backfill

boiler house and vehicle wash recycle water 

system make-up

4. Tailings storage pond volume increase



Chapter 4 Appendices

Appendix 4.4.1: Air Monitoring Methodology

Methods of Air Quality Measurement

on the Boundary of the Bakyrchik Mine Sanitary Protection Zone

For determination of the air quality on the boundary of the Bakyrchik Mine sanitary

protection zone, tool measurements of the following components are made: dust, ar-

senic (inorganic connections), nitrogen (IV) dioxide, sulphur dioxide, carbon oxide.

Measurements are taken by means of the following devices and the equipment:



arsenic, inorganic compounds — Migunov's aspirator M-852, the allonge

with a suport grid, rubber hoses, AFA-VP-10 (AFA-VP-20) filter, photo-electric

calorimeter KFK-2;



nitrogen (IV) dioxide — а Migunov's spirator of M-852, absorbing vessel of

Zaytsev filled in laboratory with the corresponding absorbing solution, a calo-

rimeter photo-electric KFK-2;



sulfur dioxide — Migunov's aspirator of M-852, absorbing vessel of Zaytsev

filled in laboratory with the corresponding absorbing solution, a calorimeter

photo-electric KFK-2;



carbon oxide — indicator tube, airintake (mechanical aspirator of AM-5),

rubber hoses;



dust — Migunov's aspirator of M-852, the allonge with a basic grid, rubber

hoses, the AFA-VP-10 filter.

Instrumental measurements are conducted in accordance with norm and methodolo-

gies existing in the RoK, including:



dust — GOST 17.2.4.05–83. Nature protection. Atmosphere. Gravimetric

method of dust suspended substances determination;



arsenic, inorganic compounds — RD 52.04.186-89 Guidelines for the Control

of air pollution. - M .: Gidrometeoizdat, 1991. Photometric method;



nitrogen (IV) dioxide — RD 52.04.186-89 Guidelines for the Control of air pol-

lution. - M .: Gidrometeoizdat, 1991. Photometric method;



sulfur dioxide — RD 52.04.186-89 Guidelines for the Control of air pollution. -

M .: Gidrometeoizdat, 1991. Photometric method;



carbon oxide — GOST 12.1.014-84 *. SSBT. Method of measuring the concen-

tration of harmful substances by detector tubes.

Measurements procedure is described below:



Dust — air sampling to determine average daily concentration of dust is con-

ducted continuously during 24 hours (in case of high dust content - by 20 min

cycles with equal intervals) with specific consumption of 5dm3 (min x cm2). To

determine one-time concentration sampling is conducted during 20 minutes.



Maximal dust capability of filter made of special fabric is 5mg/cm2. Filter with

preliminary achieved fixed mass and its ID on is put by forceps into the filter

holder fixed thoroughly with a ring and cap screw. Filters are carefully folded in

half or in four with exposed surface inside and then put into tracing paper and

plastic bag. Total volume of filtered air is determined upon completion of sam-

pling. Exposed filter is taken out of the bag, put into a glass cup and incubated

during 1 hour in the weighing room. If sample was taken at relative air humidity

close to 100% the filter mass was increased to fixed mass. For this purpose the

filter in a glass cup was put into an exsiceator with melted calcium chloride for 2

hours or drying oven with temperature from 40 °С to 50 °С for 30-50 minutes 

and then incubated for 30-50 minutes in weighing room. If the weighing

shows change of the filter's mass drying is repeated. Mass of filter with dust

is determined by means of weighing.



Arsenic, inorganic compounds — air is sampled by the methodology similar

to the methodology of sampling for dust content. Filter with sample is put in-

to a glass and poured over by 8mm of 12% aqua ammonia solution and 1ml

of 10% hydrogen peroxide and incubated during 10 minutes being stirred by

a glass stick. Then the solution is poured into porcelain cup and the filter is

washed several times by small portions (2-3ml) of aqua ammonia solution.

Every time it is thoroughly pressed off by a glass stick. Wipes are combined

with the sample and boiled dry in water bath, dry residue is then dissolved in

2ml of water. Solution is filtered through a small filter into a 5ml volumetric

tube. The cup is washed twice by 1.5ml of water and wipes are filtered

through the same filter and total volume of liquid in the tube is increased to

5ml. Then 0.5ml of ammonium molybdate solution and 0.2ml of hydrazine

sulphate are added into the tube. The content is then thoroughly shaken and

heated up in water bath during 10-15min. After cooling to indoor tempera-

ture the optical density of the solution is determined. Measurements are

conducted in 10mm wide cuvets providing wave length of 840nm using pho-

toelectric calorimeter. Before the analysis optical density of neutral sample is

measured. For this purpose clean filter is put into a glass, poured over by 8ml

of 12% of ammonia solution and analyzed by similar method. Arsenic content

in the sample is determined using calibration plot by difference of sample so-

lution and neutral solution optical density measurements results.



Nitrogen (IV) dioxide — Aspirator M-852 blows air sample through two se-

ries-connected absorption vessels with 10ml of 8% solution of potassium io-

dide in each during 20 minutes with 0.2-0.3l/min velocity. Then either 1ml or

5ml of solution from each vessel are put into calorimetric test-glass, added

with 8% solution of potassium iodide to 5ml volume and then diluted with

1ml of Griess reagent and mixed. In 20 minutes 0.01 weak solution of sodium



sulphite is added by 0.5 ml; the resulting solution is mixed and scanned pho-

tometrically in cuvet providing 1cm thickness of layer and wave length of

520nm in comparison with control solution simultaneously prepared by the

analogous methodology. Content of nitrogen (IV) dioxide is measured by pre-

liminary generated calibration plot.



Sulphur dioxide — Aspirator M-852 blows air sample through absorption ves-

sel with porous plate containing 6 ml of absorbing solution during 30 minutes

with 1-2l/min velocity. 5ml of solution sample from absorption vessel are put

into calorimetric test-glass, diluted with 1ml of barium chloride solution,

mixed and then in ten minutes scanned photometrically in cuvet providing

1cm thickness of layer and wave length of 410nm in comparison with control

solution simultaneously prepared by the analogous methodology. Content of

sulphur dioxide in analysed volume is measured by preliminary generated cal-

ibration plot.



Carbon oxide — air intake device has a detector pipe attached which is de-

signed to measure the concentration of harmful substances. Measured vol-

ume of air sample was blown through the detector pipe. Then air was sam-

pled via 3 pipes. Concentration of carbon oxide was measured by the length

of detecting powder colour change in the pipe (linear-coloristic detector

pipe). The result of measurement is arithmetic average of the results of series

of observations. If the contours of the of original and reacted powder layers’

colours are blurred concentration of the harmful substances in interest is

measured by the scale put along the upper and lower parts of the contour.

Average values of the measurement is accepted as the result.

Location of air quality sampling points is adjusted depending on the wind direction.

Georeferencing on the site plan is undertaken at the moment of sampling. All instru-

mental measurements of air quality on the boundary of the Bakyrchik mine’s are con-

ducted on single occasion being accompanied by meteorological observations. Number

of individual measurements per point is 3. Air is sampled in not less than 3 days after

precipitation.